Commissioned by Schouls BV, Kadiks delivered E&PA controls for Hoogheemraadschap van Rijnland and replaced the existing installation at weir Palenstein. Because both installations stand side by side, we delivered a separate, complete E&PA system for each structure—two clear control cabinets side by side and a tight, professional overall result. The project included civil, mechanical, electrical, and process automation work.
Hoogheemraadschap van Rijnland (via Schouls BV)
